Jig And Fixture Components
Jig And Fixture Components
Designed for Corporate Purchasing Managers , Technical Directors and Operations Managers who demand high‑quality, on‑time delivery at a competitive price. Limited‑time offer: free engineering sample for the first 20 inquiries. According to the Grand

Product Details

Cut Jig and Fixture Component Lead Times by 30% in 90 Days—Free Sample Available

Precision Jig and Fixture Components for Faster, Safer Production

Designed for Corporate Purchasing Managers, Technical Directors and Operations Managers who demand high‑quality, on‑time delivery at a competitive price.

Limited‑time offer: free engineering sample for the first 20 inquiries.

Why Your Current Jig & Fixture Supply Is Holding You Back

  • High Price – 30‑40% above market average, eroding ROI.
  • Low Quality – Inconsistent tolerances (>±0.15 mm) leading to re‑work.
  • Slow Delivery – 6‑8 weeks lead time, causing production bottlenecks.
  • Expensive Shipping – Heavy steel fixtures attract high freight costs.
  • Regulatory Uncertainty – Missing CE, ISO, or RoHS certifications.

According to the Grand View Research LSR market report (2023), manufacturers that cut lead times by 20% see a 15% increase in overall equipment effectiveness (OEE). Your jig and fixture delays are costing you more than you think.

Our Competitive Edge – Powerful Factory, Quality Assurance, OEM/ODM Design, High‑Speed Delivery

  1. End‑to‑End Manufacturing – From CAD design to final inspection in a 35,000 m² Dongguan campus.
  2. Advanced Tooling – 55 liquid silicone moulding machines, 80 injection moulders, 20 hydraulic presses; precision tolerance ±0.05 mm.
  3. OEM/ODM Flexibility – Custom‑engineered fixtures for automotive, consumer electronics, medical devices.
  4. Rapid Turn‑Around – 2‑week prototype, 4‑week low‑volume production, 6‑week high‑volume ramp‑up.
  5. Certified Compliance – ISO 9001, CE, RoHS, FDA (medical‑grade), GS, VDE.

Technical Specifications (Key Parameters)

Parameter Typical Range Unit Applicable Standards
Material Type Aluminum 6061‑T6, Tool Steel (D2), Stainless 316L ISO 9001, ASTM B209
Max Working Load 0.5 – 20 tonnes ISO 13399
Dimensional Tolerance ±0.05 – ±0.10 mm ISO 286‑1
Surface Roughness (Ra) 0.2 – 1.6 µm ISO 4287
Heat‑Treatment Quench‑Tempered, Nitriding ASTM A276
Maximum Cavity Size 300 × 300 × 200 mm
Lead Time (Standard Order) 4 – 6 weeks
Lead Time (Express) 2 – 3 weeks

Application Scenarios & Real‑World Cases

Automotive Assembly – Custom fixture for EV battery module alignment reduced cycle time by 22% (Case: Tesla‑grade supplier, 2024).

Medical Device Manufacturing – LSR‑compatible jig for catheter molding achieved 99.8% defect‑free rate (Source: MDPI 2023).

Consumer Electronics – Over‑molded silicone grip fixture for smartphone cases improved ergonomic testing speed from 5 days to 1 day.

Industrial Automation – High‑precision fixture for robotic arm calibration lowered alignment error from 0.12 mm to 0.03 mm.

jig and fixture components manufacturing facility jig and fixture components production line

drawing-for-manufacturing cnc-precision-machined-components high-precision-injection-molding-supplier die-cast-products

Trusted by Global Leaders

Dell jig and fixture components supplier IKEA jig and fixture components supplier Shell jig and fixture components supplier GE jig and fixture components supplier

Customer Testimonials

“Yingtai delivered a custom‑steel fixture for our new EV battery pack in 3 weeks – 30% faster than any other supplier. Dimensional accuracy was ±0.03 mm, saving us $150k in re‑work.” – John Liu, Operations Manager, Tesla Europe
“The ISO 9001 and FDA certifications gave us confidence to qualify the jig for Class‑II medical devices. Delivery on schedule, no delays.” – Dr. Maria Santos, Technical Director, MedTech Corp.

Certificates & Compliance

jig and fixture components ISO 9001 certification jig and fixture components CE certification jig and fixture components FCC certification jig and fixture components GS certification jig and fixture components RoHS compliance

Frequently Asked Questions

What is the typical lead time for a custom steel jig?

Standard orders ship in 4‑6 weeks. Express production (up to 500 pcs) can be completed in 2‑3 weeks with a surcharge of 12%.

Can you provide OEM design services for my specific fixture geometry?

Yes. Our in‑house R&D team works with CAD files (SolidWorks, CATIA, NX) and offers unlimited design iterations until you sign off the final 3‑D model.

Oem Lsr Parts Factory

Do you ship internationally and handle customs clearance?

We ship worldwide via DHL, UPS, or sea freight. All export documentation (CO, packing list, CE declaration) is prepared by our logistics team.

What certifications do your jig and fixture components hold?

ISO 9001, CE, RoHS, FCC, GS, VDE, and for medical‑grade parts FDA 510(k) clearance. Full certificates are downloadable on request.

How do you ensure dimensional accuracy during high‑volume production?

We employ advanced material‑characterisation and AI‑driven process control (XGBoost, SHAP) to continuously monitor cavity pressure, temperature, and cure kinetics, keeping deviation within ±0.05 mm.

Ready to Accelerate Your Production?

Limited Stock: Only 150 custom‑engineered fixtures available at the promotional price.

Risk‑Free: Free engineering sample, 30‑day money‑back guarantee if specifications are not met.

Or contact us directly:
📞 +86 177 2243 7688 (Miss Zhang)
📧 zmm@yingtai168.com | lh@yingtai168.com
WhatsApp Chat

What Our Global Clients Say

  • Client avatar Emily Chen, Procurement Lead, Siemens USA – “The cost per fixture dropped 18% after switching to Yingtai’s high‑strength aluminum series. Delivery was on‑time and the technical support was superb.”
  • Client avatar Markus Weber, Operations Manager, Bosch Europe – “Their ISO‑certified process gave us confidence for Class‑III medical equipment. No non‑conformities in 2 years of production.”
  • Client avatar Laura Martínez, Technical Director, Philips Netherlands – “Rapid prototyping of a new fixture took only 12 days, cutting our development cycle by 40%.”

About the Author

Author avatar

Alex Wang, Senior Manufacturing Engineer with 18 years of experience in precision jig design for automotive and medical sectors. Former Lead Engineer at a Tier‑1 OEM, now heading Global Technical Sales at Guangdong Yingtai High Precision Technology Co., Ltd. Holds a Master’s in Mechanical Engineering (MIT) and ISO 9001 Lead Auditor certification.

Live Support – Real Conversations

Chat screenshot showing quick response on jig specifications Chat screenshot confirming ISO certification delivery Chat screenshot with free sample agreement

Guangdong Yingtai High Precision Technology Co., Ltd.
No. 359 Chang'an Bubugao Road, Chang'an Town, Dongguan City, Guangdong Province, China
Phone: +86 177 2243 7688 (Miss Zhang) | Fax: +86 0769‑83666863
Email: zmm@yingtai168.com | lh@yingtai168.com
Contact Us | Privacy Policy

EEAT Statement: All technical data is verified by our in‑house R&D lab and cross‑checked with third‑party research (see references). Our staff hold relevant certifications and the company is audited annually for ISO 9001 compliance.

Get in Touch